- Week one is credentials, network and floor plans, almost none of it is AI.
- Get one camera end to end before touching the other ninety nine.
- Run silent for two days before anybody is asked to act on an alert.
- The first acted on alert is the milestone, not the first detection.
Rollout plans describe a week of configuration. The actual week is mostly spent finding out who has the recorder password and whether the camera VLAN can reach anything, and a plan that does not say so sets everybody up to feel behind on Tuesday.
Day by day
- Monday: inventory. Cameras, credentials, network routes, and a floor plan with positions marked. Expect a third of the list to be wrong.
- Tuesday: one camera, end to end, stream, detection, clip, console. Nothing else happens until this works.
- Wednesday: the rest of the cameras, in batches, with the floor plan open.
- Thursday: zones and rules, drawn on the plan and checked in the view.
- Friday: silent running. Alerts are generated and logged; nobody is asked to act yet.
Why the silent days matter
Two days of alerts nobody has to action is the cheapest tuning data you will ever get, and it is collected before anybody has formed an opinion about whether the system is noisy. Go live on Monday with the obvious problems already fixed, and the room's first impression is of something that works.
Frequently asked
Can this be done remotely?
The configuration, yes. The floor plan and the camera angles want somebody standing there, and the hour that costs saves the fortnight of zones drawn from a misread view.
What if the credentials genuinely cannot be found?
It happens, more often than anyone admits. Plan for a factory reset window on a subset of cameras rather than discovering the need for one mid week.
Keep reading
All articles
Field notes
Writing a handover the next shift will read
An incident log is only worth the ninety seconds the next operator gives it. A short template, and the three fields that earn their place.
Read article
Field notes
What a false positive actually costs you
Every alert nobody trusts is a shift spent scrubbing footage. A short accounting of what a noisy model does to a security team, and the two numbers worth watching.
Read article
Deployment
Adding AI to cameras you already own
A walkthrough of connecting existing recorders over RTSP, what bandwidth to expect per site, and where a rip and replace is still the honest answer.
Read article